How do you turn a passive fire defect register into a rectification scope?

Short answer

Preserve the client's original asset IDs and wording, then group the items by system, observable condition, likely repair pathway, access and evidence quality. A register becomes a workable scope at the point where the repeatable repairs separate from the exceptions.

What to do next

Send the tag, the schedule reference, the drawings you have and photographs of the actual condition. We will tell you what they show, what they cannot, and what else is needed before anyone gives a conclusion.

General information only. A conclusion about a specific condition requires the actual construction, the evidence behind it and the site condition to be reviewed.