Structural protection · System selection
Sprayed protection, intumescent coating or board encasement: what is the difference?
Sprayed protection is a thick cementitious or vermiculite-based coating sprayed onto the steel. It suits steel that will be hidden, but it is bulky and rough. Intumescent coating is a paint-like layer that swells into an insulating char in a fire. It is thin and neat, so it suits steel that is on show, but it generally costs more. Board encasement boxes the steel in fire-rated board. It is clean and dry on site, but takes space and labour around connections. The choice depends on whether the steel is visible, the rating, the environment, the programme and the evidence for each member.
What changes the answer
- whether the steel is on show
- internal or external exposure
- the fire resistance required
- site conditions, programme and access
- cost and maintenance over time
- what evidence covers each option for the members.
What to check on site
- identify which system is installed
- check condition: cracking, delamination, impact damage
- check thickness or board layers against the schedule
- check connections are protected
- check later services have not broken through the protection
- in older buildings, check the asbestos register before touching sprayed protection.
How the three systems compare
All three do the same job: slow the heating of the steel so it stays below its limiting temperature for the required period. See How does structural steel fire protection work? They get there differently.
| Sprayed | Intumescent coating | Board encasement | |
|---|---|---|---|
| How it protects | Thick insulating layer on the steel | Thin coat that swells into insulating char in a fire | Fire-rated board boxed around the member |
| Appearance | Rough, bulky | Smooth, close to a paint finish | Neat, square box |
| Best suited to | Hidden steel above ceilings, in risers and plant areas | Exposed steel where the look matters | Columns and beams where a clean, dry install is needed |
| Site conditions | Wet, messy, needs masking and protection of nearby work | Needs suitable temperature, humidity and surface preparation | Dry trade, less sensitive to weather |
| Space taken | Moderate | Least | Most |
| How thickness is checked | Measured depth at points along the member | Dry film thickness readings with a gauge | Board type and number of layers |
| Damage risk | Can be knocked off by trades | Chips and scratches; topcoat may need upkeep | Impact damage to corners; fixings cut for services |
How the choice is actually made
Appearance and cost usually start the conversation. They should not finish it. The choice is a design decision, made member by member, and it has to be backed by evidence.
Every protection product is tested to AS 1530.4 and then assessed for a range of steel sizes and shapes. The assessment report sets what thickness of that product is needed for a given FRL, section factor and limiting steel temperature. If a member falls outside the range the assessment covers, that product cannot be relied on for that member, however good it looks. See What is a steel section factor and why does it matter? and How is the required thickness of steel fire protection determined?
That is why one project often uses more than one system. A common pattern: intumescent coating on exposed feature steel in the foyer, board encasement on columns in finished areas, and sprayed protection on hidden beams above ceilings.
Other points that move the decision:
- External or damp exposure. Not every system is made for it. The evidence must cover the environment, not just the fire rating.
- Programme. Sprayed and intumescent work need curing or drying time and the right conditions. Board can go on alongside other dry trades.
- Connections. Board takes more labour around complex connections. Coatings follow the shape more easily.
- Future access. If services will be added later, consider how each system will be made good after it is penetrated.
Existing buildings
In an existing building the first question is not which system is best, but which system is there. Identify it from records, labels or the structural fire protection schedule before planning any repair. A patch is not automatically valid just because it uses the same-looking material. See Can damaged structural fire protection be repaired?
Sprayed protection in older buildings may contain asbestos. Do not sample, drill or scrape it until the asbestos register has been checked. See Can old sprayed fire protection on structural steel contain asbestos?
Mixing systems on one member, such as patching damaged sprayed protection with board, needs evidence that covers the combination and the junction between them. Without it, the repair is a judgement call that needs technical review.
What to do next
Send drawings, photographs and the required rating. We will tell you which system suits, or what the existing protection is and whether it can be repaired, for projects across Perth and regional Western Australia. See Structural fire protection.
Questions people ask
Which option is cheapest?
It depends on the members, the rating and the site. Sprayed protection is often the most economical for hidden steel; intumescent coating usually costs more but avoids boxing and saves space.
Can intumescent coating be used outside?
Some systems are made for external exposure, usually with a protective topcoat. The evidence must cover external use for that product.
Can an existing building change from one system to another?
Yes, if the new system's evidence covers the member and the rating. Removal of old sprayed protection needs an asbestos check first.
How do you check intumescent coating is thick enough?
With a dry film thickness gauge, taking readings along each member and comparing them with the schedule. It cannot be judged by eye.
General information only. A conclusion about a specific condition requires the actual construction, the evidence behind it and the site condition to be reviewed.