The building or project condition
An aged care building in High Wycombe, with new services passing through fire-rated floors and walls.
What FRS delivered
- Fire stopping to hydraulic penetrations: PVC pipe through the fire-rated floor system
- Fire stopping to fire protection penetrations: steel pipe through two-layer plasterboard fire-rated walls
- Systems matched to each substrate, since a floor system and a plasterboard wall need different solutions
What made it difficult
- An aged care setting, so the work ran after hours
- Two different substrates, each needing its own tested system
- Small quantities spread across the building rather than concentrated in one area
What was recorded at close-out
- Certification with penetration labels, as-built records and product test evidence, as standard on FRS penetration work
Small penetration jobs in aged care are where fire stopping is most often missed or done with whatever is in the van. A plastic pipe through a floor and a steel pipe through a plasterboard wall need different systems, and each one has to match its tested arrangement.
Doing it after hours meant residents and staff were not working around the crew.