The building or project condition
A volunteer fire and rescue service building in Yanchep, with mechanical, electrical and open penetrations through 200 mm concrete walls.
What FRS delivered
- Fire stopping to insulated copper pipes through concrete walls
- Fire stopping to power cable bundles through concrete walls
- Sealing of open circular voids left in the concrete walls
What made it difficult
- A public emergency services building, with inductions before the crew could start
- Work above three metres, with access arranged with the builder
- Open voids, which have to be closed with a tested system, not just filled
What was recorded at close-out
- Certification with penetration labels, as-built records and product test evidence, as standard on FRS work
An open core hole left in a concrete wall is easy to miss and easy to fill with the wrong thing. It still breaks the fire separation, and it needs a tested system like any other penetration.