The building or project condition
An existing butcher shop in Maddington, where services passed through a fire-rated element above the ceiling and needed sealing.
What FRS delivered
- A fire-rated bulkhead seal around the services, to -/60/60
- Demolition needed to reach the work: removing tiles, steel cladding and ceiling to expose the soffit
- Work limited to what was needed to do the passive fire job, with the rest left intact
What made it difficult
- The work was hidden behind a finished shop fit-out
- Tiles, steel encasing and the ceiling all had to come out before anything could be sealed
- The extra work had to be agreed as a variation before it went ahead
What was recorded at close-out
- Certification with labels and as-built records, as standard on FRS work
In a finished shop, the passive fire problem is usually behind something. The fire-rated work might be small. Getting to it is often the bigger part of the job.
We scoped the demolition separately and only removed what was needed to do the work.